Shanghai Landmark - Engineering Practice (1)

Shanghai Commercial Complex | 20+ projects

Commercial Complex PVDF 18+ Years

Project Overview

Region
Shanghai
Project Type
Commercial Complex
Total Projects
20+ projects
Supplier
Dalv Decorative
62000㎡
Total Area
25Years
Weather Resistance
PVDF
Fluorocarbon Coating
18Years
Industry Experience

Project Challenges

  • Shanghai Climate Challenges
  • Material Weather Resistance Requirements
  • Quality vs Cost Balance
  • Project Schedule Control

Solutions

  • Three-coat PVDF Fluorocarbon Process
  • Computer Color Matching System
  • 30,000㎡ Monthly Production Capacity
  • 35 Days Delivery Guarantee

Project Images

Shanghai Landmark - Engineering Practice (1) - Image 1
Project Image 1
Shanghai Landmark - Engineering Practice (1) - Image 2
Project Image 2
Shanghai Landmark - Engineering Practice (1) - Image 3
Project Image 3
Shanghai Landmark - Engineering Practice (1) - Image 4
Project Image 4
Shanghai Landmark - Engineering Practice (1) - Image 5
Project Image 5
Shanghai Landmark - Engineering Practice (1) - Image 6
Project Image 6
Shanghai Landmark - Engineering Practice (1) - Image 7
Project Image 7
Shanghai Landmark - Engineering Practice (1) - Image 8
Project Image 8

Project Introduction

As an 18-year professional aluminum panel manufacturer, Dalv has served 上海 Commercial Complex engineering projects 20+个, with a total decoration area exceeding 62000平方米. Project types cover commercial complexes, office buildings, industrial plants and more. The 上海 project is located in East China, with a Subtropical Marine Monsoon Climate. Under these conditions, High humidity and salt spray corrosion, which imposes strict requirements on the weather resistance of curtain wall materials. This project uses Fluorocarbon Aluminum Panel, with three-coat two-bake PVDF fluorocarbon spray process, coating thickness 35-40μm. The fluorocarbon coating uses imported PVDF fluorocarbon resin, ensuring 25-year weather resistance without fading under Subtropical Marine Monsoon Climate. Dalv uses computer color matching system, conducting color difference inspection on each batch to ensure ΔE≤1.5. With a monthly production capacity of 30,000㎡ in our own production base, single-project single-line production mode, 35 days for delivery to ensure project schedule. Over 18 years, Dalv has served 1000+ engineering projects nationwide, covering 19 provinces. If you have 上海 Commercial Complex aluminum panel curtain wall engineering needs, welcome to contact us.

Related Projects

Back to Cases