Tianjin Landmark - Engineering Practice (1)

Tianjin Commercial Complex | 10+ projects

Commercial Complex PVDF 18+ Years

Project Overview

Region
Tianjin
Project Type
Commercial Complex
Total Projects
10+ projects
Supplier
Dalv Decorative
16000㎡
Total Area
25Years
Weather Resistance
PVDF
Fluorocarbon Coating
18Years
Industry Experience

Project Challenges

  • Tianjin Climate Challenges
  • Material Weather Resistance Requirements
  • Quality vs Cost Balance
  • Project Schedule Control

Solutions

  • Three-coat PVDF Fluorocarbon Process
  • Computer Color Matching System
  • 30,000㎡ Monthly Production Capacity
  • 35 Days Delivery Guarantee

Project Images

Tianjin Landmark - Engineering Practice (1) - Image 1
Project Image 1
Tianjin Landmark - Engineering Practice (1) - Image 2
Project Image 2
Tianjin Landmark - Engineering Practice (1) - Image 3
Project Image 3
Tianjin Landmark - Engineering Practice (1) - Image 4
Project Image 4
Tianjin Landmark - Engineering Practice (1) - Image 5
Project Image 5
Tianjin Landmark - Engineering Practice (1) - Image 6
Project Image 6
Tianjin Landmark - Engineering Practice (1) - Image 7
Project Image 7
Tianjin Landmark - Engineering Practice (1) - Image 8
Project Image 8

Project Introduction

As an 18-year professional aluminum panel manufacturer, Dalv has served 天津 Commercial Complex engineering projects 10+个, with a total decoration area exceeding 16000平方米. Project types cover commercial complexes, office buildings, industrial plants and more. The 天津 project is located in North China, with a Temperate Monsoon Climate. Under these conditions, Cold and dry, which imposes strict requirements on the weather resistance of curtain wall materials. This project uses Fluorocarbon Aluminum Panel, with three-coat two-bake PVDF fluorocarbon spray process, coating thickness 35-40μm. The fluorocarbon coating uses imported PVDF fluorocarbon resin, ensuring 25-year weather resistance without fading under Temperate Monsoon Climate. Dalv uses computer color matching system, conducting color difference inspection on each batch to ensure ΔE≤1.5. With a monthly production capacity of 30,000㎡ in our own production base, single-project single-line production mode, 35 days for delivery to ensure project schedule. Over 18 years, Dalv has served 1000+ engineering projects nationwide, covering 19 provinces. If you have 天津 Commercial Complex aluminum panel curtain wall engineering needs, welcome to contact us.

Related Projects

Back to Cases